ORANGE PARK, FL

Superior Fireworks

 
  • Kendale constructed a 25,000-sq-ft, ground-up distribution, office and retail facility, including associated sitework.
  • Features include a specialty facade system and lighting, Metl-Span insulated panels over pre-engineered steel structure, access control, and extensive fire protection systems.
  • The project was completed in nine months, despite the impact of a hurricane during the process
  • Assisted owner in due diligence and selection of potential project sites, informing them of pros and cons of each site for the best outcome.
  • Unique and creative use of pre-engineered systems allowed for attractive and efficient construction at a low cost.



SERVICES PROVIDED:


Pre-construction
Design/Build